Project: Oil storage tank (industrial facilities for storing liquids)
Location: Krasnodar region
Year: 2020
Duration: 5 days
Technology: SLAB LIFTING
Elimination of uneven settlement of structures and leakage of the oil tank in the port
Problem
Subsidence of the tank bottom
Solution
Eliminating structural settlement while maintaining the slope
Problem
Object:
Port, oil storage tank, volume 5,000 m³.

Method:
Uretek SLAB LIFTING.

Problem:
Settlement of the tank bottom, area = 318.57 m². The cause of the settlement is loosening of the foundation due to variable loads during operation and regular leaks.

Task
Strengthen the tank bottom subgrade, level the steel bottom, eliminate the leak.
Solution
URETEK resins were injected under the tank bottom, and work was carried out to eliminate irregularities in the bottom while creating a technical slope.