Object:
Port, oil storage tank, volume 5,000 m³.
Method:
Uretek SLAB LIFTING.
Problem:
Settlement of the tank bottom, area = 318.57 m². The cause of the settlement is loosening of the foundation due to variable loads during operation and regular leaks.
Task
Strengthen the tank bottom subgrade, level the steel bottom, eliminate the leak.