Before starting the foundation strengthening work, a comprehensive survey was carried out to determine the density of the foundation, identify weak‑bearing soil horizons, and detect voids under the floor slab.
To solve the task of strengthening the foundation soils, the deep injection method – Deep Injection – was chosen. The work was carried out from the outside of the building; injections were performed at several levels, with injection tubes installed at a specific angle according to the design. To solve the task of filling the void under the floor slab, work was carried out inside the building, with injections performed strictly vertically.
After completion of the foundation soil strengthening and void filling, a set of geodetic works was performed to install control marks for further monitoring and annual geomonitoring.