Object:
A warehouse for food and non‑food products with an area of 23,000 sq. m.
Problem:
During the construction of the warehouse for food and non‑food products, uneven settlement of the floor slab and the foundation part of the loading docks occurred. During the survey, voids up to 15 cm were found under the floor slab, and the deviation of the floor slab from the design level reached 8 cm. The settlement of the foundation part of the loading docks was up to 9 cm, which led to the structures hanging on adjacent elements.
Task
Level the floor slab in the horizontal plane, lift the settled foundation elements of the loading docks.