Project: Unloading, loading, and storage area for food products (food warehouses and complexes)
Location: Sverdlovsk Region, Russian Federation
Year: 2018
Duration: 14 days
Technology: DEEP INJECTION & SLAB LIFTING
Lifting and leveling of floor and foundation slabs after uneven settlement
Problem
Uneven settlement of the floor slab and foundation part of the piers
Solution
Leveling the floor slab and raising the sunk foundation elements
Problem
Object:
A warehouse for food and non‑food products with an area of 23,000 sq. m.

Problem:
During the construction of the warehouse for food and non‑food products, uneven settlement of the floor slab and the foundation part of the loading docks occurred. During the survey, voids up to 15 cm were found under the floor slab, and the deviation of the floor slab from the design level reached 8 cm. The settlement of the foundation part of the loading docks was up to 9 cm, which led to the structures hanging on adjacent elements.

Task
Level the floor slab in the horizontal plane, lift the settled foundation elements of the loading docks.
Solution
Uretek specialists carried out work to strengthen the foundation of the floor slab, fill the discovered voids under the slab, level the floor slab in the horizontal plane, lift the loading dock foundations, and restore the working condition of the loading docks.