During the construction of a reinforced concrete foundation on a pile foundation, a void formed beneath the slab. Because the foundation was subjected to dynamic loads from the concrete mixing unit conveyor system, the designers decided that it was necessary to recreate the full‑area support of the slab grillage on the foundation. This solution reduces the negative impact of dynamic loads on the piles.
Task
Recreate the full‑area support of the foundation slab on the foundation.