Issue to be resolved:
Strengthening the foundation soils under the tanks of treatment facilities. Aggravating conditions: weak waterlogged soils and an unsuccessful attempt at stabilisation by cementation.
Initial data
At the treatment facilities built in 2019, belonging to a processing complex, settlement of the slab foundations began. Given that separate foundations were poured under different tanks and vessels, and the loads differed, the settlements ranged from 3 to 15 centimetres. There was concern about the high risk of damage to the utilities passing under the floor slab, especially the pipelines connecting the treatment facility tanks. Initially, soil stabilisation was attempted by cementation, and after that failure, they turned to URETEK.
Goal
Strengthen the soils beneath the slab foundations, stop the movement of the slab foundations under the tanks.