In 2018, a developer company, commissioned by Lenenergo, carried out the construction of a transformer substation. The depth of the underground foundation part is at -1.7 m, while as a result of the survey, a fully undisturbed virgin soil foundation was found at a depth of -1.9 m. Due to the uncompacted foundation, the structure developed a tilt of 6 cm. The customer did not accept the results – the developer turned to Uretek to compact the foundation and level the tilt to meet the tolerances.