Before starting the foundation strengthening work, a set of activities was carried out to determine the density of the foundation and identify weak‑bearing soil horizons. To solve the task, the deep injection method – Deep Injection – was chosen. All work was carried out from the basement part of the building, with injections performed at an angle. After completion of the foundation soil strengthening, a set of geodetic works was performed to install control marks and benchmarks for further monitoring of vertical and horizontal displacements of the building.