Before starting the foundation strengthening work, a set of geodetic monitoring was carried out to accurately determine the settlement vector of the tank, and loosened horizons of the foundation soil were also identified using dynamic probing. To solve the task, the deep injection method – Deep Injection – was chosen. All work was carried out from the surface of the foundation slab, with injections performed at a right angle. The injection of the self‑expanding composition (in plan) was carried out from the slab perimeter towards the centre. The result of the work was the lifting of the foundation slab at the point of greatest tilt by 8 mm. All work on lifting and levelling the structure was carried out under constant supervision of the surveying service.