Project: Factory for the production of semi-finished products
Location: Moscow region
Year: 2016
Duration: 10 days
Technology: SLAB LIFTING & VOID FILLING
Repair work due to floor slab deflections and cracks in the load-bearing walls
Problem
Floor slab deflection and cracks in the load-bearing walls
Solution
Reinforcement of void filling and leveling of the floor slab
Problem
At the end of 2016, at a semi‑finished products factory, in a workshop with an area of 2,500 m², a comprehensive survey revealed significant zones of loosened soil, as well as zones of voids formed between the floor slab and the soil. This in turn led to deflection of the floor slab, the appearance of cracks on the load‑bearing walls, and consequently a halt in the production process due to disruption of the geometry of industrial equipment. According to a preliminary conclusion, the problems with the foundation soil could have arisen due to a breach in the sewer system.

Task:
Uretek specialists were tasked with strengthening the soil layer at a depth of –1.5 to 4.0 m, filling voids, and levelling the floor slab in the areas according to the developed project.
Solution
Technology applied:
Injection of geopolymer compositions for deep strengthening, void filling and floor slab levelling.

Result:
Within 10 working days, Uretek carried out comprehensive work on deep strengthening, void filling and levelling the floor slab to the design values. The successfully completed work allowed the customer to start production lines the very next day.