During the reconstruction, it was discovered that the lighthouse was built on a pier constructed using sheet piles. However, over time, the filler between the piles had been washed out and voids had appeared in it. This jeopardised the integrity of the entire structure.
Goal
The project required URETEK specialists to fill the voids between the sheet piles and stabilise the existing foundation. The work was carried out underwater at depths of up to 3 metres along a perimeter 30 metres long.