Project: Logistics Center
Location: Moscow Region, Russia
Year: 2015.
Duration: 14 days
Technology: SLAB LIFTING
Solving the problem of uneven settlement of floor slabs in the warehouses of Itella LLC
Problem
Uneven precipitation of the floor slab
Solution
Stabilization and lifting of reinforced concrete floor slabs
Problem
LLC Itella, a leading provider of transport and logistics services in Russia. In 2014–2015, at one of the branches of LLC Itella engaged in the storage and delivery of pharmaceutical products, work was carried out using URETEK technology to stabilise and lift the reinforced concrete floor slab (from 10 to 45 mm), with a total area of 1,354 m².
Solution
The work was completed in the shortest possible time – 14 calendar days. The company also provided a 60‑month warranty to OJSC Itella on the quality of the work performed.
Standard projects and pricing
If the project description does not satisfy you, request a project consultation with a geotechnical engineer to get your own assessment of Uretek technologies
Leave your phone number and our consultant will contact you