In July 2015, work was carried out to strengthen the foundation soils to a depth of up to –5.5 m from the surface of the asphalt concrete pavement, in order to prevent further deformation and settlement of the asphalt concrete pavement. The work was completed within 6 calendar days without stopping planned construction work, and all signs of the work were also eliminated.