In summer 2016, work was carried out to strengthen the foundation soils using URETEK technology by the DEEP INJECTION method and to level the crane rail using the SLAB LIFTING injection method. Work area – 1100 linear metres.
Due to the high temperature during daylight hours, the work was carried out at night. The result of the work was the levelling of the crane rails along the entire travel path of the hoist crane within tolerances of ±5 mm between the rails.