Project: Warehouse facilities (food industry)
Location: Moscow region
Year: 2016
Duration: 6 days
Technology: DEEP INJECTION & SLAB LIFTING
Restoration work in food storage facilities
Problem
The foundation settled with deformations that affected the floor slabs
Solution
Stopping the settlement of foundations and leveling the working surface of floor slabs
Problem
The building was restored and reconstructed on an existing old foundation. After the walls and roof were erected, the foundation settled with deformations that affected the floor slabs.
Solution
Within 7 working days, work was carried out to strengthen the foundation soils using URETEK technology by the DEEP INJECTION method and to level the floor slabs.

Result
The result of the work was the cessation of foundation settlement processes and the levelling of the working surface of the floor slabs in the storage areas.