Technologies applied:
The problem was solved by the DEEP INJECTION method according to URETEK technology, which involves injecting an expanding polymer mixture into the foundation soil to strengthen it and level foundation settlement. In total, 16 injections were performed at different levels under the foundation footing, which ensured strengthening of the foundation soil and lifting of the settled structures by an average of up to 10 mm, and the work lasted only 2 working days.