The house was built on an existing old foundation. After the walls and roof were erected, the foundation settled.
Task:
The house with a first‑floor area of 186 m² needed strengthening of the foundation and its base, and good access for the work was expected. The soil conditions of the site had soft, sandy silt. The goal was to level the house as economically as possible, since repair costs were not included in the original construction budget.