Carry out repair work on a settled section of the Second Moscow Ring Road as quickly as possible and without completely stopping vehicle traffic.
Initial data:
On one section of the 2nd Minsk Ring Road, a defect appeared in the form of road pavement settlement with a total length of 35 m, which disrupted the speed limit for vehicle traffic. A preliminary survey of this section showed that under the road pavement structure, due to uneven deformations, loosening of the foundation soil had occurred.
Goal:
Restore the operational performance of the settled section of the Ring Road by strengthening the soil under the road pavement and levelling the surface of the settled concrete slabs with a total area of approximately 350 m², as quickly as possible in anticipation of the facility's handover.