Object:
Petroleum product tank with a volume of 1,000 m³.
Method:
Deep injection, Slab Lifting.
Problem:
During operation involving constant filling and emptying of the tank, uneven settlement of the structure occurred with a non‑standard tilt.
Task:
Level the tank structure in the vertical plane.