Project: Fuel tank
Location: Kemerovo region
Year: 2020
Duration: 7 days
Technology: DEEP INJECTION & SLAB LIFTING
Strengthening the base and raising the fuel tank structure to the required level
Problem
Construction settlement with abnormal roll
Solution
Leveling the tank structure
Problem
Object:
Petroleum product tank with a volume of 1,000 m³.

Method:
Deep injection, Slab Lifting.

Problem:
During operation involving constant filling and emptying of the tank, uneven settlement of the structure occurred with a non‑standard tilt.

Task:
Level the tank structure in the vertical plane.
Solution
To solve the task, a preliminary comprehensive survey of the foundation base was carried out, the results of which confirmed loosening of the foundation soils. The technical solution involved deep strengthening of the foundation soils of the tank base and lifting the most settled part of the foundation in order to level the tank structure in the vertical plane.
Standard projects and pricing
If the project description does not satisfy you, request a project consultation with a geotechnical engineer to get your own assessment of Uretek technologies
Leave your phone number and our consultant will contact you